The construction of a new standalone plant control building at Beddington Sewage Treatment Works as part of Thames Water’s £22m upgrade works at the site. The build consisted of an independent steel frame with a cold rolled steel roof structure and masonry infill walls. The works were carried out on a live Sewage Treatment Works and had to be coordinated with the other Civil Engineering works which were ongoing.